Project Lead Supervisor Aug 2013 – Apr 2014
Varo Engineering for Owens-Corning Inc. L’Ardoise, France
§ Project Lead Supervisor (reported to Project Manager) for an Owens-Corning project in L’Ardoise, France. Responsible for overseeing the creation of all Technical documentation and Drawing Packages.
§ Worked in Conjunction with the French Engineering Team to ensure timely deliverables for all project requirements.
§ Was on the committee to select contractors in France to execute all phases of this project.
§ Site Supervisor for various phases of the project including all concrete and structural steet as well as some mechanical equipment installation.
Lead CSA and Site Supervisor Oct 2010 – Apr 2013
Adecco for Corning Inc. Beijing, China
§ Engineered new and mark-up existing drawings and specifications utilized by vendors for bidding and facility construction as well as by the contracts department.
§ Assisted in the development of initial time lines and schedules for construction.
§ Managed several contracts and contractors during construction (concrete, structural steel, architectural, fireproofing, fire-stopping and industrial floor coatings LPG & Oxy Systems).
§ Organized meetings with vendors for materials, products and equipment selection.
§ Worked closely with contractors while setting and aligning six GE generators for the co-gen system.
Lead Project Designer | Mar 2006 – Feb 2010 |
TKW Consulting Engineers, Inc., Orlando, Florida | |
§ Tasked with structural design for a number of projects ranging from simple slab-on-grades to concrete tanks for wastewater treatment facilities, office buildings and schools.
§ Was the company representative between TKW and contractors for site work.
§ Started Orlando office AutoCad users group and attended monthly meetings throughout Florida.
§ Responsible for site inspections of ongoing work for various building types and underground waste-water treatment tanks.
§ Met with contractors and clients to review work scopes and deliverables.
Senior Designer | Mar 2004 – Jan 2006 |
O.T.I. (Optimation Technologies Inc.), Rush, New York | |
§ Responsible for structural design for Nexpress/Kodak projects, including concrete and steel designs.
§ Extensively interacted with clients, engineers, and vendors while supervising other detailers on many projects.
§ Tested raw materials for pureness tolerance, prior to use in furnace.
§ Installed equipment and debugging for proper through-put, spare parts manual and inventory control.
§ Devised standard operating procedures for batch systems broken down by individual process and equipment.
Manager Structural and Technical Departments | Apr 2002 – Mar 2004 |
Dietrich Design Group, McDonough, Georgia | |
§ Efficiently managed a staff of 12 engineers, 3 drafter/designers and 2 technical representatives.
§ Monitored quality control of drawings prior to release, assigned projects to engineers and drafters, conducted site visits and acted as technical phone representative for a light gauge steel engineering and manufacturing firm.
Senior Designer, | Feb 2001 – Apr 2002 |
O.T.I. (Optimation Technologies Inc.), Rush, New York |
|
Same as above
Manager Mechanical/ Structural Department | Mar 1994 – Jan 2001 |
Klug Systems Company, Rochester, New York |
|
§ Lead a staff of 18 engineers, designers and detailers for a firm specializing in glass batching projects and accountable for project estimation and bidding.
§ Projects assignments include raw material unloading, conveying, storage, mixing and distribution to the furnace both mechanically and pneumatically.
§ Visited sites for contractor walk-through during the bidding stages.
§ Coordinated project and personnel activities in collaboration with other departments.
§ Consistently maintained high levels of accuracy on estimates and schedules.
§ Instrumental in the development, procurement and set-up of Klug’s first network.
§ Authored departmental drafting procedure manual and company standard equipment drawings.
§ Worked with other disciplines during start-up and debug phases ensuring strict adherence to set timelines.